Coriolis Mass Flowmeter with 0.05 Repeatability for Custody Transfer with ATEX, IECEx, SEIL Certification
Product Description
Coriolis mass flowmeter can directly measure the mass flow-rate, density and temperature of the flowing medium.
The flowmeter is an intelligent meter with digital signal processing as the core, thus a dozen of parameters can be outputted for user according to the three fundamental quantities above. Featured with flexible configuration, strong function and high cost perfomance, the Coriolis Mass Flowmeter is a new generation of high-precision flow meter. Coriolis Mass Flowmeter is a new generation of high-precision flow meter, which is flexible configuration, powerful function and high cost perfomance.
Phase Difference:The phase difference is caused by the Coriolis force, which is generated when the medium moves in a rotating system. The Coriolis force at the inlet of the flowmeter opposes the movement of the measuring tube, while the Coriolis force at the outlet of the flowmeter helps the measuring tube move. This results in a phase difference between the two detectors, as shown in the figure on the right.
ANDISOON is the earliest manufacturer in China engaged in the trade measurement of natural gas dispensers (CNG, LNG). Mass flowmeter is the core product of the company.
It is the leading brand of mass flowmeter in the domestic cryogenic and high-pressure field; its products have long been used in high-pressure and low-temperature fields. Stable performance, fully meets trade measurement requirements; widely used in natural gas and hydrogen energy filling, thermal power, oil and gas, chemical industry, refrigerant, pharmaceutical, medical, food and beverage and other process industries.
Andisoon mass flowmeters passed ATEX, CCS, IECEx and PESO certificates.
It can be used to directly measure the mass flow rate of fluid in pipeline without the influence of temperature, pressure and flow velocity.
High accuracy and excellent repeatability. Wide range ratio (100:1).
Cryogenic and high pressure calibration is employed for high -pressure flowmeter. Compact structure and strong installation interchangeability. Small pressure loss and wide range of working conditions.
The hydrogen mass flowmeter has excellent small flow measurement performance, which can fully meet the working conditions of the hydrogen dispensers. There are currently two types of hydrogen mass flowmeters: 35MPa and 70MPa (rated operating pressure). Due to the high safety requirements of hydrogen flowmeter, we have obtained the IIC explosion-proof certificate.
Product Parameters
Model |
AMF015SN |
AMF020SN |
AMF006H |
Noiminal Diameeter |
DN15 |
DN20 |
DN6 |
Accuracy |
0.15%, 0.2%, 0.5% |
Denisty |
density: ±0.001g/cm |
Medium Sate |
Liquid /Gas |
Max flow |
30kg/min |
70kg/min |
20kg/min |
Working pressure |
≤25MPa |
≤100MPa |
Connection |
Internal Thread |
G1
(internal thread) |
13/16-16UNF |
Wetting Material |
SS304,SS316L |
Expl.-Proof |
IP67 , Ex d ib ii C T1-T5 Gb |
Accuracy |
0.1% (Optional), 0.15%, 0.2%, 0.5% (Default) |
Repeatability |
0.05% (Optional), 0.075%, 0.1%, 025%(Default) |
Density |
±0.001g/cm3 |
Temp. |
±1°C |
Answer the liquid material |
304 , 316L, ( Customizable: Monel 400, Hastelloy C22 , etc.) |
Measuring medium |
Gas, Liquid and Multi-phase flow |
>>Application: measure the flow of gases, liquids, and other fluids. They are widely used in the measurement of high-pressure gases such as CNG, Hydrogen.
Mass flow meters are known for their high accuracy, wide measuring range and reliable performance, and have been successfully used in various industries over the past many years.
Unlike other instruments that are limited to measuring liquids at normal pressure and temperature, ANDISOON excels in measuring under challenging conditions, including high pressure, high viscosity, and high and low temperatures. For example, when measuring CNG (compressed natural gas), the difficulty lies in the high pressure. However, ANDISOON's sensors can withstand high pressures, allowing the necessary increase in flow tube thickness, allowing the transmitter to detect signals with greater sensitivity. Therefore, ANDISOON's mass flow meters specially designed for CNG gas dispensers have been widely used in the domestic market
In the field of cryogenics, Andisoon has developed a backflow meter and a liquid phase injection meter for LNG refueling stations, with a minimum temperature of -253°C.
In the field of process control, Andisoon has developed a micro-bend type mass flowmeter, with a maximum flow rate of up to 300t/h, widely used in petroleum, chemical and other industrial conditions.
(1) For electronic products, we have automatic chip mounter (SMT) production line and high/low temp. testing equipment.
(2) For mechanical products, we have advantage on casting, machining, and welding which is the key point in eyes of Russian.
(3) For calibration, we have calibration facilities approved by China government for oil, water and gas.
(4) For flowmeter, we are Top leaders in China for both of Coriolis Mass Flowmeter & PD flowmeter, which be approved the UL, CE, CCS (China) and BV certificate (France) for marine market.
(5) For pump, we combined Russian technology with China low cost to manufacture for large capacity transportation of oil, chemical, water, and wastewater even if contain some participles and we also design and produce twin-screw pump for high pressure, high viscosity liquid with multiphase.
(6) For SCADA loading & metering/ Skid Mount System, we also have much experience in China and in Afghanistan, Equatorial Guinea and are trying to promote in all over the world.
FAQ
1. Customer: What is the delivery date?
Andisoon: Our stock is based on GB/DIN flange, with a delivery date of 10 days. We also accommodate other flanges like ANSI/JIS or thread connection, with a delivery date of 15 days.
2. Customer: Can you design according to my requirements?
Andisoon: Yes, we offer OEM service and can tailor products to your specifications.
3. Customer: What is the warranty period?
Andisoon: The quality guarantee period is 12 months from the completion of installation and commissioning by the purchaser, or 14 months from the date of delivery (whichever comes first), excluding maintenance kits or small accessories.